Projects and References
Projects
TK Energy has participated in a large number of research, development and demonstration projects including:
Green Fuel Cell
Green Fuel Cell was a EU financed project with the aim of developing a reliable, up-scaleable and cost effective staged gasification system of biomass.
The role of TK Energi was to design and build a staged gasifier consisting of a pyrolyses bed, a char bed and a slagging combusting chamber.
Chris Gas
Chris Gas was also a EU financed gasification project. TK Energi´s role was to develop a 3 stage plug feeder for feeding biomass into a gasifier.
2.3 MW CHP-Plant
As a part of an other EU financed project TK Energi has developed and produced a prototype of a 2.3 MW gasifier. The gasifier can produce gas based on wood chips to substitute natual gas for production af electricity and heat in a local Central Heating Plant.
Slagging Waste Gasifier
TK Energi has participated in the project High Temperature Slagging Gasifier for Waste. Compared to traditional waste incineration plants this system benefits of a gasification system with much higher energy and electricity efficiency, reduced emission and production of inert slag wich can be used as landfill.
References
TK Energi has provided customers with a number of tailor made solutions for handling of biomass and waste including:
Southern Research Institute, USA
Range Fuel, USA
Foster Wheeler, Finland
Thermal Research Institute, USA
Dong Energy, Denmark
Vattenfall, Sweden
Køge-egnens Renseanlæg (Sludge Treatment), Denmark
Sun Chemical, Denmark
DTU Risø, Denmark
CP Kelko; Denmark